Five Reasons For Heavy-duty Operation of Concrete Mixing Plant
April 29th, 2020

Clients reported to us that the concrete mixing plant that has been used for many years always has heavy load operation. So what are the reasons for the heavy-duty operation of the building? The following 5 suggestions hope to help operate and use the concrete mixer.

1. The concrete mixer determines the water supply volume according to the required concrete ratio, and adjusts the time relay to the corresponding water supply time;

2. The concrete mixer starts the operation of the mixing motor of the concrete mixer;

3. The concrete mixer closes the discharge door, adds the required mixture into the hopper, and raises the hopper. The hopper of the stable soil mixing station should run smoothly and stop at any position on the track freely. If there is slippage, the hopper should be put into the bottom of the pit first, and then adjust the large nut of the brake motor. The hopper is lifted normally, after reliable braking, the material is fed into the mixing drum and the water pump is started to supply water to the mixing drum;

4. After the concrete mixer mixes 25-35S, start the discharge door to discharge;

5. During the above-mentioned trial operation, if any abnormality is found in the concrete mixer, it should be immediately stopped and checked to eliminate the fault, and then tested again until normal. After a day of operation of the new concrete mixer, the bolts and nuts of the lining board and other places should be checked and tightened. The lubricating parts of the transmission are lubricated with oil.


Sinoroader Concrete Mixing Plant

CONTACT US

Tel:4000-676-878

WhatsApp/Wechat:+86 181 3785 8347

E-mail:info@sinoroader.com

Add:Longxiang Industrial Park ,

Weidu District, XuChang,HeNan, China

Add:Longxiang Industrial Park ,

Weidu District, XuChang, HeNan, China

Copyright © 2024 Henan Sinosun heavy Industry Corporation. Amallink.com