Construction Fundation Of Concrete Mixing Plant
April 15th, 2020

As for investing in the construction of a concrete mixing plant, whether it is a small mixing plant, a medium-sized mixing plant, or a large-scale mixing plant, the goals are the same. We want to get the return from the investment and get profit. Therefore, before the cement concrete mixing plant is built, investors should do a comprehensive and full investigation.

The importance of investment in cement concrete mixing plants

Location description of cement concrete mixing plant selection

Concrete is different from other commodities. Once produced, it must be put into use quickly. Otherwise, the concrete will solidify due to time, resulting in a decline in the quality of the concrete product. In severe cases, the entire batch of concrete will be scrapped. Therefore, the concrete produced by the concrete mixing plant must be transported to the construction site as soon as possible for reasonable use.


13


On this basis, the concrete mixing plant should pay attention to the surrounding environment at the beginning of construction, and try to choose a place with a stronger construction site as close as possible. Generally speaking, we say that the distance between the concrete mixing plant and our construction site should be within 10 kilometers. Only within 30 kilometers. Of course, it depends on our special local environment. We will analyze specific issues.

Construction guide of cement concrete mixing plant

First, the basic plan should be designed according to the different engineering conditions of the customer. When designing the basic map, the surrounding environment should be fully considered, for example, the softness or geographical location of the land should be moderate, and the source of raw materials should be sufficient.


14


Secondly, the foundation construction is carried out according to the designed foundation plan, and then the embedded iron is used for the embedded. This is the key to construction. Therefore, if it is not properly buried according to the drawings, many problems will be faced during the construction of the plant, which will cause the normal installation and commissioning of the equipment. Therefore, the plant construction drawings must be determined before construction of the plant and must not be ignored.


CONTACT US

Tel:4000-676-878

WhatsApp/Wechat:+86 181 3785 8347

E-mail:info@sinoroader.com

Add:Longxiang Industrial Park ,

Weidu District, XuChang,HeNan, China

Add:Longxiang Industrial Park ,

Weidu District, XuChang, HeNan, China

Copyright © 2024 Henan Sinosun heavy Industry Corporation. Amallink.com